MENU

News

Works start off in the Monte Bianco Tunnel

September 01 2024

Works start off in the Monte Bianco Tunnel

The machines Grotti S.r.l. rented with their operators to the Italian-French consortium Cogeis/Spi Batignolles, winner of the tender for the first phase of extraordinary maintenance of the Monte Bianco Tunnel, arrived in September to commence works.

On duty in the Monte Mario Tunnel

July 15 2024

On duty in the Monte Mario Tunnel

A GTF 400 RC and a GTF 400.2 RC, rented without operators by the contractor MD, started work on the A1 highway in the south tube of the Monte Mario Tunnel.

An SM 1200 the right solution for kerb demolition

June 15 2024

An SM 1200 the right solution for kerb demolition

It was decided for a project on the SS 685 national road outside Spoleto to perform specialty milling using a GTF 400 RC attached with an SM 1200 cutter head.